Customization: | Available |
---|---|
Load Capacity: | 18.9 Ton |
Certification: | ECE, GCC, CE, ISO9001, DOT, CCC, ISO/TS16949 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main parameters | |
Overall dimensions (LxWxH) | 11500x2500x3750 mm |
Tare weight | 14500 kg |
Loading capacity | 18900 kg |
Total weight | 33400 kg |
Shell of tanker | |
Major material of bearing material | Tanker body Q345Rmm, End plate Q345R 14mm |
Design pressure | 1.61 MPa |
Design temperature | to 50 Celcius |
Corrosion pressure | 2.0 mm |
Compartment | One |
Shape | Round(Elliptica) |
Detection | |
Heat treatment | overall heat treatmment in a furnace, 600 Celcius to 640 Celcius |
Flaw detection | 100% flaw detection |
Chassis | |
Axle | Fuwa brand axle 13 ton x 3 |
Suspension | Mechanical suspension |
Spring | leaf spring 10 / 10 /10 |
Traction pin | 2.5" or 3.5" |
Landing leg | JOST D200 single linkage, gear type |
Tire | Triangle brand 12R22.5 tubless tyre |
Accessories | |
Fire extinguisher | 2 pcs |
Tool box | 1 unit |
Spare tyre carrier | 1 units |
Color | optional |
Nude and waxed by bulk cargo ship or Ro-Ro ship or flet deck, and Containers..
We use best transportation solution to save your sea freight cost.
Our Services:
1.Warranty
we have one year warranty for main parts, such as Engine, Gearbox, Chassis, Hydraulic Lifting System,we will provide free spare
2. Maintenance
The first maintenance should be taken after 2000KMs or 50working hours,we will provide you one book of the maintenance with all of our truck .
3.Payment term:
A.30 % TT for the deposit ,the balance paid before shipment.
B.100% irrevocable L/C at sight
4.Delivery time:
15 days after receiving the 30% deposit or L/C at sight
After-Sales Service :
12months for 3 key parts (engine, transmission, axle).
Tracking service time: lifelong.
Third-party service for overseas client.
Use the steps Description
Parts supply on time
Othe types of semi trailers we can produce:
1.Low bed semi-trailer : transport heavy duty machinery
2.Fuel tank semi-trailer : transport oil,gasoline,diesel,fuel,etc.
3.Flatbed container semi-trailer : carry 1x40ft/2x20ft/1x20ft container
4.Van type semi-trailer
5.Warehouse gate semi-trailer
6.Bulk powder semi-trailer
7.Dump trailer
8.Side wall semi-trailer
Cutomized cement bulker trailer welcomed.
FAQ:
1.Q: Are you a manufacturer or trading company?
A: We are manufacturer.
You are welcomed to visit our factory.
2.Q: What kind of payment do you accept?
A: We accept T/T and L/C at most.
If you want to use others payment, contact me for more info.
3.Q: What's your delivery time?
A: It depends on the products.
Products | Delivery time |
Low bed trailer, Container trailer, skeleton trailer, side wall trailer, | 10-15 days |
Fuel tanker trailer, bulk cement trailer | 30 days |
Special truck, like detachable gooseneck trailer, hydraulic modular trailer | 35 working days |
4.Q: What's warranty time?
A: Main frame, one year; Vulnerable parts,three month; Others parts, half year;
5.Q: What's your after-sale service?
A: We provide technical support for our products.
Besides, we also provide you spare parts as long as you