Customization: | Available |
---|---|
Type: | Semi-Trailer |
Load Capacity: | 80T |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dimension and Weight: | |
Overall Dimension(mm) | 12500*2500*2550 |
Cargo box dimension (mm) | 12000X2300X600 |
Tare Weight(KG) | 6550 |
Loading Weight( KG) | 50000 |
Total Weight(KG) | 56350 |
Chassis and Running System: | |
Axle Brand | 13Ton, Fuwa brand option one hundred fifty thousand Kilometers no need maintenance |
Axle Number | Three |
Wheelbase(mm) | 7450+1310+1310 |
Suspension system | Mechanical Leaf Spring Suspension |
Leaf spring | 90(W)mm*13(Thick)mm*10 Layer |
The material of Main beam | Q345B carbon steel,The height of the beam is 500 mm, upper plate is14mm,down plate is 16mm, middle plate is 8 mm. |
Side beam | Q235 16# channel steel |
Platform plate | 3mm Diamond plate |
Tire | 12R22.5, 12 pcs. Taitong brand |
Rim | 9.0*22.5 steel disc wheel, 10 holes ISO, 12 pcs |
Electrical System | Chinese standard 24V lighting system |
Brake system: | Dual line pneumatic brake, SAE hose and connector,no ABS |
Brake air chamber | 6 units T30/30 spring brake chambers |
Emergency relay valve | Wabco relay valve |
Traction/King Pin | JOST 2" and 3.5" removable Kingpin, bolted in type 500mm from the front face of the front bolster |
Landing Gear | Zhenhua brand 28ton external two speed telescopic manual operation 2,500mm behind the kingpin location |
Accessories: | |
Tool box | 1pcs, One crank and one shaft head wrench |
Mud guard | Steel mud guard and front mudguard |
Spare wheel carriers | 2 pcs |
Paint | Shot blast at Standard SA 2.5 prior to application of primer, polyurethane top coat. Total DFT not less than 100um,A layer of anti-rust paint,two-layer finish.Waxed |
Packing | Nude, Polish with wax before shipping |
Products | Delivery time |
Low bed trailer, Container trailer, skeleton trailer, side wall trailer, | 10-15 days |
Fuel tanker trailer, bulk cement trailer | 20 days |
Special truck, like detachable gooseneck trailer, hydraulic modular trailer | 25 working days |